I have entered in Material Resources using type=Material, and assigning to a
task, entering Units and cost is calculated based on Stand. rate x units.
This works great.
I want to track how much is remaining on all my material. Some has been
invoiced, so I tried to enter this into Actual cost field to get Remaining
cost to calculate. But Actual cost is locked. How do I get remaining costs
to show how much is really remaining?