Am using the "Day" function in a formula on a cash flow worksheet
purpose is to put the item due in the correct week of each month . Nee
to add 4 days to the result of the "day" function so that items due on
Sat/Sun/Mon/Tues are scheduled to be paid the previous week. It work
fine except when the day of month is the 27th or higher, as adding
creates a number over 30 and does not recognize the end of month
Example: Rent payment due the first of each month. Cell A5 would sho
the description "rent"; cell B5 shows the first date due "eg: 6/01/03"
cell C5 shows amount "2,000". columns D,E,F, etc are all week date
ending on a Friday (for example, 1/03/03; 1/10/03; etc) - these date
are located in each column in row 3. An example of the formula bein
used is in the attached fil
Attachment filename: cash flow.xls
Download attachment: http://www.excelforum.com/attachment.php?postid=64311
purpose is to put the item due in the correct week of each month . Nee
to add 4 days to the result of the "day" function so that items due on
Sat/Sun/Mon/Tues are scheduled to be paid the previous week. It work
fine except when the day of month is the 27th or higher, as adding
creates a number over 30 and does not recognize the end of month
Example: Rent payment due the first of each month. Cell A5 would sho
the description "rent"; cell B5 shows the first date due "eg: 6/01/03"
cell C5 shows amount "2,000". columns D,E,F, etc are all week date
ending on a Friday (for example, 1/03/03; 1/10/03; etc) - these date
are located in each column in row 3. An example of the formula bein
used is in the attached fil