Trying to link specific milestones from several project
plans into a program level Top Plan. (Do not want to
Master/SubProject because of excessive detail and
organization is not how we want to track)
Have linked a few fields as a test with 3 files and it
works.
However, after linking many fields across a limited number
of files, later get error on Update when opening the Top
Plan that Project cannot find the source file. (Even
though stored in same place, or if pre-opened).
Are there limits to number of links possible? Are there
directory path limits causing the problem?
plans into a program level Top Plan. (Do not want to
Master/SubProject because of excessive detail and
organization is not how we want to track)
Have linked a few fields as a test with 3 files and it
works.
However, after linking many fields across a limited number
of files, later get error on Update when opening the Top
Plan that Project cannot find the source file. (Even
though stored in same place, or if pre-opened).
Are there limits to number of links possible? Are there
directory path limits causing the problem?