I have all our resources in the Resource Sheet. In the Gantt Chart, we can
choose from the pull down menu the resource we need in the Resource column.
I also have a Requested By column. This person would be one of those listed
in the Resource Sheet, but could be different from the resource chosen in the
Resource column.
My question is how I can make it so that I have a different person in the
Resource column, and a different person in the Requested By column?
Thank you all very much.
I am a PM consultant with over 10 years in the field, and unlimited travel
flexibility throughout the world. I also have experience with CA’s Niku
products.
Feel free to drop me a line at (e-mail address removed) if your looking for someone in
this field.
- - - jzis
choose from the pull down menu the resource we need in the Resource column.
I also have a Requested By column. This person would be one of those listed
in the Resource Sheet, but could be different from the resource chosen in the
Resource column.
My question is how I can make it so that I have a different person in the
Resource column, and a different person in the Requested By column?
Thank you all very much.
I am a PM consultant with over 10 years in the field, and unlimited travel
flexibility throughout the world. I also have experience with CA’s Niku
products.
Feel free to drop me a line at (e-mail address removed) if your looking for someone in
this field.
- - - jzis