Unstaggering in Day View?

P

PG Oriel

Hi,

I am a teacher, and I've just set up my lessons in the Outlook calendar. I
have lessons that are adjacent to each other, such as 8.45-9.40 and then
9.40-10.35.

When I put this into Outlook, because of the 15 min blocks it staggers the
lessons across the day view, on a diagonal because the "blocks" can't fit
under each other.

Is there anyway to make them appear directly underneath each other as it is
quite confusing to look at.

Many thanks.
 
B

Brian Tillman

PG Oriel said:
I am a teacher, and I've just set up my lessons in the Outlook
calendar. I have lessons that are adjacent to each other, such as
8.45-9.40 and then
9.40-10.35.

When I put this into Outlook, because of the 15 min blocks it
staggers the lessons across the day view, on a diagonal because the
"blocks" can't fit under each other.

Is there anyway to make them appear directly underneath each other as
it is quite confusing to look at.

Try using a ten or five minute time scale n the Day view. RIght-click the
day view pane, choose Other Settings and try the other time scales.
 