Dear All,
I have an issue about unverified lines in timesheet, that doesn't show in
EPM_timesheet cube.
1. I tried to create timesheet
2. I choose add lines
3. From the popup window, i choose new timesheet line (to create new project
by my own)
4. I select non standard category
5. i filled the actual time in the new project created (example 4 hours in
15 Sept 2008)
Than i saved and submited the timesheet.
In the next day, my supervisor approved the timesheet and generated the cube.
But he really depressed when he didnt see the 4 hours timesheet line that i
created in EPM_timesheet.
Am i missed something?
I have an issue about unverified lines in timesheet, that doesn't show in
EPM_timesheet cube.
1. I tried to create timesheet
2. I choose add lines
3. From the popup window, i choose new timesheet line (to create new project
by my own)
4. I select non standard category
5. i filled the actual time in the new project created (example 4 hours in
15 Sept 2008)
Than i saved and submited the timesheet.
In the next day, my supervisor approved the timesheet and generated the cube.
But he really depressed when he didnt see the 4 hours timesheet line that i
created in EPM_timesheet.
Am i missed something?