D
daven
I hope someone can help me with this. I'm using Project Server 2003.
Resources enter time via PWA.
I have a need to track material resources using PWA. Is there a way to
assign a material resource to a task and have a PWA user update it?
My exact situation is as follows: A lab tech is assigned to a task "Sample
Processing". I can set up a material resource called "Samples". I want the
lab tech to be able to enter the number of samples he processed this week,
along with the number of hours he worked. Is this possible to do with PWA?
Resources enter time via PWA.
I have a need to track material resources using PWA. Is there a way to
assign a material resource to a task and have a PWA user update it?
My exact situation is as follows: A lab tech is assigned to a task "Sample
Processing". I can set up a material resource called "Samples". I want the
lab tech to be able to enter the number of samples he processed this week,
along with the number of hours he worked. Is this possible to do with PWA?