S
SteveP
Note: We are using MS Project Professional (w/PWA) v.2007 SP1
I've looked through the PWA views and both types of out-of-box reports
in professional and don't find anything similar to this - if someone
knows of such a report, or how I can make a modification to an
existing report for this, please let me know. (I know that we can
build custom reports, but was hoping to find something existing that
would fit this need)
Users are requesting a report that will show all of their tasks
assigned to them for all projects (preferred in sequence by date) -
then the preference is to be able to run this report for a specific
date range.
Any suggestions?
Thanks
Steve
I've looked through the PWA views and both types of out-of-box reports
in professional and don't find anything similar to this - if someone
knows of such a report, or how I can make a modification to an
existing report for this, please let me know. (I know that we can
build custom reports, but was hoping to find something existing that
would fit this need)
Users are requesting a report that will show all of their tasks
assigned to them for all projects (preferred in sequence by date) -
then the preference is to be able to run this report for a specific
date range.
Any suggestions?
Thanks
Steve