O
O Chacon
I need to have a linegraph where the X axis has the dates of, say, Oct 1,
Oct2, Oct 3 AND Oct 7, Oct 8, Oct 9. My issue is that whenever I try to set
the graph up, Excel adds the dates of Oct 4-6 which I do not want. How can I
fix this?
I have Win XP (SP2) and Office 2003.
Thanks.
Oct2, Oct 3 AND Oct 7, Oct 8, Oct 9. My issue is that whenever I try to set
the graph up, Excel adds the dates of Oct 4-6 which I do not want. How can I
fix this?
I have Win XP (SP2) and Office 2003.
Thanks.