C
Christophe
Hi,
I want to create a new report based on an existant one.
I saw i can use 2 methods CopyObject or TransferDatabase.
The problem is that VBA project is protected by password
and i don't want to leave this protection.
Is it possible that i send by code the password before
running CopyObject or TransferDatabase and then allow the
copy of the report ?
Thanks for answer.
Christophe
I want to create a new report based on an existant one.
I saw i can use 2 methods CopyObject or TransferDatabase.
The problem is that VBA project is protected by password
and i don't want to leave this protection.
Is it possible that i send by code the password before
running CopyObject or TransferDatabase and then allow the
copy of the report ?
Thanks for answer.
Christophe