L
LYNABY
DESCRIPTION PART # PART $ LABOUR
BDY R/I L PICKUP BED SIDE PANEL 25871809 $642.50 13.5 $921.65
REF REFINISH L BED OUTER SIDE PANEL 3.0 $204.81
REF REFINISH L ADD FOR EDGE 0.5 $34.14
BDY R/I FUEL TANK EXISTING 1.0 $68.27
PAINT MATERIALS
SHOP MATERIALS
I NEED TO ADD ALL THE LABOUR TIME FOR ROWS STARTING WITH BDY TOGETHER AND
MUTIPLY THEM BY 6.12 TO GET MY SHOP MATERIALS TOTAL, AND ADD ALL LABOUR TIME
FOR ROWS STARTING WITH REF TOGETHER AND MULTIPLY THEM BY 32.68 TO GET MY
PAINT MATERIALS TOTAL. WHAT KIND OF A FORMULA DO I USE AND HOW DO I SET IT
UP?
BDY R/I L PICKUP BED SIDE PANEL 25871809 $642.50 13.5 $921.65
REF REFINISH L BED OUTER SIDE PANEL 3.0 $204.81
REF REFINISH L ADD FOR EDGE 0.5 $34.14
BDY R/I FUEL TANK EXISTING 1.0 $68.27
PAINT MATERIALS
SHOP MATERIALS
I NEED TO ADD ALL THE LABOUR TIME FOR ROWS STARTING WITH BDY TOGETHER AND
MUTIPLY THEM BY 6.12 TO GET MY SHOP MATERIALS TOTAL, AND ADD ALL LABOUR TIME
FOR ROWS STARTING WITH REF TOGETHER AND MULTIPLY THEM BY 32.68 TO GET MY
PAINT MATERIALS TOTAL. WHAT KIND OF A FORMULA DO I USE AND HOW DO I SET IT
UP?