R
rition
I have been thinking about a problem for days but still haven't
decided the best way to set up the spreadsheet, last year it was a
logistical nightmare.
I have seventeen trainers who will be able to work one or two sessions
out of nine sessions i.e. Mon-Fri pm, Sat and Sun am/pm and can have a
maximum of five trainees each. Each trainer will only run one training
session per availability i.e. if they are available Mon and Fri they
will only run a course on either Monday or Friday.
Then I have 99 trainees who will be available to attend one or more of
the sessions and I have to allocate as many of them as possible, i.e.
Trainer A can provide training on either Monday pm or Sunday am
Trainer B can provide training on Thursday pm
Trainer C can provide training on Sun pm
etc
Trainee 1 can attend on either Mon or Thur pm
Trainee 2 can only attend on Sunday pm
Trainee 3 can attend on Sunday pm or Monday pm
etc
Can anyone suggest a way to organise this spreadsheet (and, but this
is secondary, then pull the information to a database so that I can
run a letter to the trainer and trainees advising them of their
trainer/trainees and days and dates of their course.)
I know that I haven't made myself very clear so thanks for any help in
advance.
decided the best way to set up the spreadsheet, last year it was a
logistical nightmare.
I have seventeen trainers who will be able to work one or two sessions
out of nine sessions i.e. Mon-Fri pm, Sat and Sun am/pm and can have a
maximum of five trainees each. Each trainer will only run one training
session per availability i.e. if they are available Mon and Fri they
will only run a course on either Monday or Friday.
Then I have 99 trainees who will be available to attend one or more of
the sessions and I have to allocate as many of them as possible, i.e.
Trainer A can provide training on either Monday pm or Sunday am
Trainer B can provide training on Thursday pm
Trainer C can provide training on Sun pm
etc
Trainee 1 can attend on either Mon or Thur pm
Trainee 2 can only attend on Sunday pm
Trainee 3 can attend on Sunday pm or Monday pm
etc
Can anyone suggest a way to organise this spreadsheet (and, but this
is secondary, then pull the information to a database so that I can
run a letter to the trainer and trainees advising them of their
trainer/trainees and days and dates of their course.)
I know that I haven't made myself very clear so thanks for any help in
advance.