Why "Timesheet" Tab is still there?

  • Thread starter åŠæ–°ä¸æ—§
  • Start date
Å

åŠæ–°ä¸æ—§

Hi, I am woundering how can I remove the "Timesheet" tab from task update
page openned in outlook (through Outlool Add-in with Ps2007)?
I have deselected all timesheet related item from PWA_Server
Settings_Project Web Access Permission. Is eleswhere needed to be configured?

Thanks in advance,

JJin
 
M

Marc Soester [MVP]

Hi Jjin,

I am sorry to say, but the button remains in the taskupdate :(
 