Hi, I am woundering how can I remove the "Timesheet" tab from task update
page openned in outlook (through Outlool Add-in with Ps2007)?
I have deselected all timesheet related item from PWA_Server
Settings_Project Web Access Permission. Is eleswhere needed to be configured?
Thanks in advance,
JJin